What we’ve done this week

Lots of progress this week, we have placed a load of stuff in the frame to test everything fits (it does).  The first of our battery holders has been made, our drive speed controllers are now done (including a bunch of firmware modifications).  Our control system is now being tested and so far is working.  Our final orders for interior parts are all done, so once those bits arrive we have everything to put the robot together.

We are aiming for a test of the fully assembled weapon in the next week or two, then a full drive test after that.

Written by admin

Leave a Reply