We’ve now finalised the physical design of our robot, this means all CAD models are now complete. Our electronics design is not fully completed yet however. On the physical side of things team is now switching from design phase to production phase. All our big components which we can’t manufacture ourselves, such as shapes cut from hadox steel plate, or things that need complex milling we are now working with or looking for suppliers . Components we can fabricate our selves we are starting working on. Lots of the components we can fabricate are 3d printed, plenty of these take a long time to produce (for example 1 part which we have 12 of take 58 hours to print). Quite a few components we are also producing in metal.
Moulding Time
It’s been a while since we’ve posted any thing, but the team as not been idle. Lots of stuff has been happening with the electronics, and our drive system. We’ve also started making some moulds for our tires. Including making a nice moulding box.
Posted on 18th June 2018 by admin
Leave a Reply
You must be logged in to post a comment.